Installations

Installations

Click to download a presentation of some of our projects (1 MB file).

Bike Ports
110 kWp installation on bicycle parking structures in eastern China. Product: XR36.
ODOT
53 kWp installation for the Ohio Department of Transportation.”It was a pleasure to work with Xunlight on the ODOT project. Their modules were easy to install and reduced our labor expense. Xunlight’s customer service and technical support was excellent as well.”– John Witte, President, Advanced Distribution Generation LLC (prime contractor for the project).
 
Scott Park
8 kWp installation for the University of Toledo, Scott Park Campus.
 
OANG
21 kWp installation for the Ohio Air National Guard.
Residential
2.1 kWp residential installation on asphalt shingle roof in Michigan. Product: XR12.
 
Melink
3 kWp installation for the Melink Corporation.”I wanted to let you know that as we’ve been monitoring the performance of the Xunlight modules over the course of the past several months we have been pleased. Comparing the output of the Xunlight array to a similar technology on a per-Watt basis, Xunlight is generating roughly 10% more power. What has made this even more impressive is that the modules are directly applied on our flat roof (white membrane) and can get visibly dirty but still perform well. On a production/Watt comparison the Xunlight product is in the top quarter of the technologies that we have installed at our facility.”– Bryan Miller, Engineering Manager, Melink Corporation.